Basement finishing: what to fix before you start

Short answer

Basement finishing should start with water, not walls. Before you frame anything, fix any leaks, watch the humidity for a few weeks that include a heavy rain, and get any crack that might be moving looked at. In most cases, don’t put plastic sheeting behind the drywall on a basement wall, because it can trap moisture. Plan the sump pump, the dehumidifier and access panels before the walls close, and if you’re adding a bedroom, sort out the egress window first.

On this page
  1. Fix the water first
  2. Is your basement dry enough for basement finishing?
  3. Cracks and structure: when to call an engineer first
  4. Do you need a vapor barrier on basement walls?
  5. Basement subfloor and flooring
  6. Materials that tolerate a basement
  7. Plan the sump, the dehumidifier and access before the walls close
  8. Columns, beams and posts
  9. Egress and basement bedrooms
  10. Do you need a permit to finish a basement?
  11. How to finish a basement: the order that avoids rework
  12. The most expensive mistakes
Finishing a basement wall without trapping moisture Two sections of a finished basement wall. Left, an assembly that works in many basements: 1, continuous rigid foam sealed directly against the concrete; 2, a stud wall in front of it; 3, drywall; 4, a bottom plate protected against decay where it sits on the slab; 5, drywall kept off the floor. Right, an assembly that traps moisture: 6, fiberglass against the concrete; 7, plastic sheeting behind the drywall; 8, moisture from the concrete condensing inside the wall; 9, drywall touching the slab, where mold starts. Schematic, not to scale; the exact assembly depends on the foam, climate, wall and code. Works in many basements 1 2 3 4 5 Traps moisture 6 7 8 9
  1. Rigid foam sealed directly against the concrete
  2. Stud wall
  3. Drywall
  4. Bottom plate protected against decay
  5. Drywall kept off the floor
  6. Fiberglass against the concrete
  7. Plastic sheeting behind the drywall
  8. Moisture condensing inside the wall
  9. Drywall touching the slab
SoilConcrete / masonryWoodInsulationWater
Schematic, not to scale. The exact assembly depends on the foam, climate, wall and code.

Fix the water first

I check a basement in this order before it gets finished:

  1. Outside drainage: gutters, downspouts, grading, window wells.
  2. The water history: when it came in, where and with what kind of rain.
  3. Foundation walls and floor: cracks, white mineral deposits (efflorescence), stains, damp areas.
  4. The sump and drainage system, if there is one.
  5. Plumbing and HVAC condensate.
  6. Relative humidity over a period of time, not a single reading.
  7. Moisture in the wood: the sill plate, rim joist and framing.
  8. Mold or a musty smell.
  9. Then the structure.

I would say “not yet” if there’s:

  • an active leak;
  • dampness I can’t explain;
  • an unreliable sump pump;
  • mold;
  • wet framing;
  • foundation movement nobody has checked;
  • high humidity for long periods.

I don’t want the drywall to be the test of whether the water problem was solved. For causes and fixes, see water in the basement, yard grading and basement mold.

Is your basement dry enough for basement finishing?

There’s no single test. I do three things. First, I leave a hygrometer or data logger in the basement for at least two to four weeks, ideally including a heavy rain. That period is my field criterion, not a standard. I don’t want to judge from one afternoon’s reading. As a practical target, I like a basement around 45 to 55% relative humidity and doesn’t want to see it above 60% for long stretches; the 45 to 55% is my preference. The EPA recommends keeping indoor humidity below 60%, ideally between 30% and 50% (EPA).

Second, after a big storm I check the joint between the wall and the floor, cracks, window wells, the sump and low spots. Third, I tape a square of plastic over a patch of concrete for a day or two. If moisture shows up underneath, the concrete is passing moisture through. If it shows up on the room side, it may be condensation. I treat that as a clue, not proof that the whole slab or wall is dry. If a basement is only dry because it hasn’t rained in three weeks, I wouldn’t call it ready. More on basement humidity.

Cracks and structure: when to call an engineer first

Before the drywall goes up, Daniel Mercer wants to be able to see anything that might be moving. He pays particular attention to:

  • horizontal cracks;
  • bowing;
  • stair-step cracking;
  • cracks with one side offset from the other;
  • cracks that change width;
  • a foundation wall that has shifted;
  • a deteriorated sill or beam;
  • leaning posts;
  • floors that already sag;
  • signs of settlement.

A stable hairline vertical crack in poured concrete doesn’t automatically call for an engineer. But if he doesn’t know whether a crack is stable, he wouldn’t cover it yet. Size alone doesn’t decide; the pattern, movement and displacement matter more. He would ask for an evaluation before finishing if there’s sideways movement in a wall, significant displacement, settlement, several related signs, or a crack that changed while it was being watched. See foundation cracks and bowing walls.

Do you need a vapor barrier on basement walls?

Usually not the plastic kind. I don’t automatically put plastic sheeting behind the drywall. In fact, it’s one of the things that worries me most on basement walls. Concrete can pass moisture for the life of the house. Build a stud wall with fiberglass and then put polyethylene on the room side, and you can create a place where moisture gets trapped without anyone seeing it. I’ve opened walls like that and found wet insulation, mold on paper-faced drywall, rotting bottom plates and condensation against the concrete.

In many cases I prefer continuous foam insulation directly against the concrete, well sealed, with the stud wall in front of it. The exact assembly depends on the foam, the climate, the wall and the code. What matters is not creating two very tight layers that trap water between them.

The Department of Energy’s guidance says the same: Class I vapor retarders, like polyethylene sheeting, shouldn’t go on the room side of fibrous insulation in basements, because they can trap moisture inside the wall (DOE Building Science Education). Its Building America Solution Center shows rigid foam installed directly against the below-grade wall as a capillary break between the concrete and the wood framing, and says not to put plastic sheeting under the drywall (Building America Solution Center). Virginia’s residential code requires an interior vapor retarder on frame walls in colder climate zones, but basement walls and the below-grade part of any wall are exempt (R702.7).

Basement subfloor and flooring

It depends a lot on the slab. If the slab is dry, with good moisture control underneath and no history of water, I may put some finishes right on top, if the manufacturer allows it. When I have doubts about moisture, I like to separate the finished floor from the concrete with a system designed for it.

More forgiving in a basementUse with more care
TileCarpet and pad directly on concrete
Some resilient floorsSolid hardwood
Subfloor systems made to resist moistureEngineered wood that’s sensitive to moisture
Laminate with a fiberboard core

Vinyl can survive getting wet just fine and still trap water underneath. “Waterproof flooring” doesn’t mean “waterproof basement.”

Materials that tolerate a basement

Moisture-resistant drywall can make sense, but it isn’t waterproof; if there’s water behind it, it will have problems too. I keep drywall off the floor, because I don’t want gypsum touching a slab where it can wick up water. Wood in contact with concrete needs the right protection: Virginia’s residential code calls for naturally durable or preservative-treated wood for sills and sleepers on a slab in contact with the ground, unless they’re separated by an impervious moisture barrier, and for furring strips or framing attached directly to concrete or masonry walls below grade, unless an approved vapor retarder goes between them (R317.1).

What I consider marketing is any material sold as a “mold-proof basement” without talking about water first. There’s no board that fixes a wet basement.

Plan the sump, the dehumidifier and access before the walls close

Before closing the walls, I want to know what the basement depends on to stay dry. If it depends on a sump, I want the pump working, the discharge right and room to service it. If a failure could flood the finished basement, a backup and a high-water alarm make a lot of sense. If it needs a dehumidifier every summer, decide beforehand where it goes, how it drains and how the air will move. I don’t want to finish a basement and then find the sump boxed in behind a cabinet that has to come apart to change the pump.

I also leave access to:

  • cleanouts;
  • shutoff valves;
  • drainage;
  • mechanical equipment;
  • plumbing.

Columns, beams and posts

Daniel’s rule is simple: if it’s holding something up, don’t move it so the basement looks better. A steel column may look badly placed in the middle of a future room. That doesn’t mean it can move three feet. Moving a post can change the beam span, the load on the footing, how much the floor deflects and the load path. Boxing it in is usually a different matter, as long as you don’t damage the column, don’t hide corrosion that needs watching, keep access where it’s needed and don’t interfere with connections. He also wouldn’t cut a beam to run plumbing or ductwork because the ceiling plan looks nicer. If the finishing work needs to move columns, beams, bearing walls or structural posts, he wants to know first how that load gets redistributed.

Egress and basement bedrooms

In Virginia, every basement bedroom needs its own emergency escape and rescue opening, and new bedrooms created in an existing basement aren’t exempt. My advice is to settle the egress window before building the room, not after. Sizes, sill height and window wells are in egress windows.

Do you need a permit to finish a basement?

Usually, yes, but the rules are local. In Fairfax County, for example, interior alterations and renovations require a building permit (Fairfax County), and the county publishes its own Typical Finished Basement Details, based on the 2021 Virginia Residential Code. Cutting a new opening in an exterior basement wall or building a new window well needs a plan submission there. Check with your own building department before you start.

How to finish a basement: the order that avoids rework

This is the order that follows from Daniel’s checks and mine:

  1. Fix outside drainage and any leaks.
  2. Watch the humidity and the walls through some wet weather.
  3. Get any crack that might be moving checked before it’s covered.
  4. Plan egress, the sump, backup, dehumidifier and access panels.
  5. Get the permit.
  6. Insulate the walls without trapping moisture.
  7. Frame, run services, then drywall kept off the floor.
  8. Floors that tolerate a basement.

Printable checklist

Before you finish a basement

The checks from this page, in order, on one printable page. One page, US Letter.

Download PDF

The most expensive mistakes

In my experience, the number one mistake is finishing over a water problem that “only happens once in a while.” After that:

  • drywall right in front of a wet foundation wall;
  • fiberglass against concrete;
  • polyethylene in the wrong place, trapping moisture;
  • carpet on a damp slab;
  • covering cracks before knowing whether they move;
  • boxing in sump pumps and plumbing;
  • no access to shutoff valves;
  • building a bedroom and thinking about egress afterward;
  • finishing everything in a dry spell without having seen the basement through a wet season.